Project Details

Categories:
Client: Pont de Bizerte
Location: Bizerte

The Challenge

We are responsible for installing:

  • 400KVA transformer station 30KV cabin.
  • TGBT wiring 630A and Distribution boards.
  • Power Machines and 100A Canalis.
  • Paths cables.
  • Industrial and office lighting.
  • Photovoltaic Outdoor lighting.
  • Power conditioning Groups.
Follow by Email
Facebook
LinkedIn