YKK SOUSSE

THE CHALLENGE

We are responsible for:

  • Air 17KV transformer station 3X150KVA.
  • TGBT wiring 630A and Distribution boards.
  • Power Machines and Canalis 40A..
  • Paths cables.
  • Canalis industrial lighting and outdoor lighting and office.
  • Lighting 02 white room.
Follow by Email
Facebook
LinkedIn

PHILANE RESIDENCE

THE CHALLENGE

We are responsible for installing:

  • 400KVA transformer station 30KV cabin.
  • TGBT wiring 630A and Distribution boards.
  • Power Machines and 100A Canalis.
  • Paths cables.
  • Industrial and office lighting.
  • Photovoltaic Outdoor lighting.
  • Power conditioning Groups.
Follow by Email
Facebook
LinkedIn